INTERCONTINENTAL HOTEL

4 Megawatts Gas project

The power generated was Stepped Up to 33KV by means of Medium Voltage Transformers and 33KV Switchgear, which were all provided and installed by Mikano from Start to Finish. The Main Fuel Source used in this Project is Compressed Natural Gas (CNG) due to challenges faced as a result of the unavailability of the gas pipeline in that area.

×